Vietnam.vn - Nền tảng quảng bá Việt Nam

Experience the subway before ticket sales day

Báo Tin TứcBáo Tin Tức19/11/2024

The upper section of the 8. 5-kilometre-long Nhơnn Metro line will be operated commercially, with a fare of VND12,000 per ride; free for children under 6 years old, working people, seniors over 60 and disabled persons.
On August 7th, the Municipal Railroad Administration The city of Hanoi (MRB) and the Hanoi Railway Company (HMC) carried out a clean-up of the entire line, preparing the last works before the date on which the Nhoan - Ha Noi station high-speed railway was put into operation. The video And the experience beam of the Metro Line:
Chú thích ảnh
The urban railway project No. 3, section Nhổn - Hà Nội Station uses 10 trains of French own design, starting from S1 (Nhổn) station at the Industrial University of Hanoi.
Chú thích ảnh
With the theme of The Green Journey, the train consists of three colours: blue, pink and white.
Chú thích ảnh
Line lounges and ticket counters.
Chú thích ảnh
The train tickets are designed in the form of cards from card.
Chú thích ảnh
Word cards (value store cards) can be loaded and used repeatedly.
Chú thích ảnh
Automated ticket counters are designed with touch screens, so that passengers can select the desired station and check prices.
Chú thích ảnh
A day ticket is worth 24,000 VND for a single day and there's no limit to the number of visits; monthly tickets are 200,000 VND, student priority, students 100,000 VND/month. .
Chú thích ảnh
People can pay with cash or credit cards.
Chú thích ảnh
Besides, people can also buy tickets online at the counter.
Chú thích ảnh
For the first 3 months, opening hours were 5:30 a. m. ; closing time was 10:00 p. m. , extending regular train runs by 10 minutes per trip.
Chú thích ảnh
In the next period, depending on passenger needs will be adjusted accordingly.
Chú thích ảnh
High-altitude railway test operation experience.
Chú thích ảnh
By testing a bottle of water on the window while the train is running, minimal vibration demonstrates smooth operation and quality.
Chú thích ảnh
50 train drivers had covered 3,000 kilometers on the line before being certified.
Chú thích ảnh
The operational speed of the train can be up to 60 km/h.
 
Chú thích ảnh
Chú thích ảnh
Fire extinguishers were placed under the seats.
Chú thích ảnh
In the train carriages there are security camera systems connected to the cockpit and control center.
Chú thích ảnh
An electronic bulletin board combined with a radio speaker will notify passengers of the train before it arrives at the station.
Chú thích ảnh
The upper section of the line is 8. 5 km long, from Nhổn to Cầu Giấy. It consists of 8 stations: Nhổn (S1); Minh Khai (S2); Phú Diễn (S3); Cầu Diệm (S4); Lê Đức Thọ (S5); Đại học Quốc gia (S6); Chùa Hà (S7); Cầu Giới (S8).
Chú thích ảnh
Each train has four cars.
Chú thích ảnh
Speaking to the press, Mr. Nguyen Ba Son, Deputy MRB said that the unit is still waiting for a decision on the date of commercial operation.
Chú thích ảnh
The MRB expects the line to be operational in early August 2024.
Central source/news report
See also:https://baotintuc.vn/anh/trai-nghiem-tau-metro-nhon-truoc-ngay-ban-ve-20240807124351860.htm

Comment (0)

Please leave a comment to share your feelings!

Di sản

Figure

The Enterprise

News

Political Activities

Destinations

Happy Vietnam
234

234

Test bộ ảnh

Test bộ ảnh

Tests

Tests