Vietnam.vn - Nền tảng quảng bá Việt Nam

Experience Nhon Metro train before ticket sale date

Báo Tin TứcBáo Tin Tức19/11/2024

The 8.5 km elevated section of the Nhon Metro Line will operate commercially, with a ticket price of VND12,000/trip/route; free for children under 6 years old, meritorious people, seniors over 60 years old, and people with disabilities.
On August 7, the Hanoi Urban Railway Management Board (MRB) and the Hanoi Railway Company (HMC) cleaned the entire route, preparing the final work before the Nhon - Hanoi Railway Station elevated metro line goes into operation. Video and photos of the experience of the Nhon Metro elevated section:
Photo caption
Urban railway project No. 3, Nhon - Hanoi Railway Station section uses 10 specially designed French trains, starting from station S1 (Nhon) at Hanoi University of Industry.
Photo caption
With the theme "Green Journey", the train has three colors: green, pink, red and white.
Photo caption
Waiting room and ticket counter of the line.
Photo caption
Train tickets are designed in the form of magnetic cards.
Photo caption
Magnetic stripe cards (stored value cards) can be loaded with money and used multiple times.
Photo caption
The automatic ticket counter is designed with a touch screen, so passengers can choose the station they want to go to and check the price.
Photo caption
Daily ticket 24,000 VND is valid for one day and unlimited number of trips; monthly ticket 200,000 VND, priority for students 100,000 VND/month...
Photo caption
People can pay by cash or credit card.
Photo caption
In addition, people can also buy tickets online at the counter.
Photo caption
In the first 3 months, the route opens at 5:30 a.m. and closes at 10 p.m., with trains running every 10 minutes.
Photo caption
In the future, depending on passenger needs, appropriate adjustments will be made.
Photo caption
Experience the trial operation of the elevated railway line.
Photo caption
Through testing, placing a bottle of water on the window while the train was running, the vibration was minimal, proving the smooth operation and quality of the train.
Photo caption
50 train drivers traveled 3,000 km on the route before being certified.
Photo caption
The train's operating speed can be up to 60 km/h.
Photo caption
Photo caption
Fire extinguishers are located under the seats of the train.
Photo caption
Each train car has a security camera system connected to the cockpit and the dispatch center.
Photo caption
Electronic information boards combined with loudspeakers will notify train passengers before arriving at the station.
Photo caption
The elevated section of the line is 8.5 km long, from Nhon to Cau Giay, including 8 stations: Nhon (S1); Minh Khai (S2); Phu Dien (S3); Cau Dien (S4); Le Duc Tho (S5); National University (S6); Chua Ha (S7); Cau Giay (S8).
Photo caption
Each train has 4 cars.
Photo caption
Speaking to the press, Mr. Nguyen Ba Son, Deputy Head of MRB, said that the unit is still waiting for the decision on the commercial operation date.
Photo caption
MRB expects the line to be operational in early August 2024.
Trung Nguyen/Tin Tuc Newspaper
Source: https://baotintuc.vn/anh/trai-nghiem-tau-metro-nhon-truoc-ngay-ban-ve-20240807124351860.htm

Comment (0)

Simple Empty
No data

Same tag

Same category

The 'U-turn' of the only female student admitted directly to Ho Chi Minh City University of Medicine and Pharmacy
How does artificial intelligence work?
Ho Chi Minh City - the shape of a modern 'super city'
A series of events promises to bring Binh Dinh's image far and wide.

Same author

Heritage

Figure

Enterprise

No videos available