Vietnam.vn - Nền tảng quảng bá Việt Nam

Overview of the Nhon - Hanoi Railway Station elevated railway line before operation

VietnamPlusVietnamPlus19/11/2024

The 8.5km long Nhon - Hanoi Railway Station metro line is expected to be operational from August 9. Thus, people on the Nhon - National Highway 32 - Cau Dien - Mai Dich - Cau Giay route will soon be able to take the train to work every day.

The elevated section of the Hanoi Urban Railway project (from Nhon Depot to S8-Cau Giay Station) has completed construction, installation and trial operation, and the acceptance work has been completed to meet the conditions for commercial operation. (Photo: Hoai Nam/Vietnam+)

The elevated section of the Hanoi Urban Railway project (from Nhon Depot to S8-Cau Giay Station) has completed construction, installation and trial operation, and the acceptance work has been completed to meet the conditions for commercial operation. (Photo: Hoai Nam/Vietnam+)

It is expected that by August 9, people will have access to the new urban railway line, be able to visualize their own daily routines, and the line will operate for 15 days free of charge. (Photo: Hoai Nam/Vietnam+)

It is expected that by August 9, people will have access to the new urban railway line, be able to visualize their own daily routines, and the line will operate for 15 days free of charge. (Photo: Hoai Nam/Vietnam+)

At train stations, there are staircases, escalators on the way up, and elevators on both sides of the sidewalk for the convenience of passengers with disabilities, the elderly, and children. (Photo: Hoai Nam/Vietnam+)

At train stations, there are staircases, escalators on the way up, and elevators on both sides of the sidewalk for the convenience of passengers with disabilities, the elderly, and children. (Photo: Hoai Nam/Vietnam+)

After the 15 free days, the regular monthly ticket price is 200,000 VND, priority tickets are 50% off for passengers who are students, students, and workers in industrial parks; buying in groups of 30 or more costs 140,000 VND. Daily tickets cost 24,000 VND, and can be used for the entire route during the day. Tickets to stations along the way cost from 8,000 to 12,000 VND. (Photo: Hoai Nam/Vietnam+)

After the 15 free days, the regular monthly ticket price is 200,000 VND, priority tickets are 50% off for passengers who are students, students, and workers in industrial parks; buying in groups of 30 or more costs 140,000 VND. Daily tickets cost 24,000 VND, and can be used for the entire route during the day. Tickets to stations along the way cost from 8,000 to 12,000 VND. (Photo: Hoai Nam/Vietnam+)

The elevated railway section over the newly opened Mai Dich steel overpass. (Photo: Hoai Nam/Vietnam+)

The elevated railway section over the newly opened Mai Dich steel overpass. (Photo: Hoai Nam/Vietnam+)

According to the technical design of the elevated Nhon - Hanoi Railway Station urban railway line, each train consists of 4 carriages, each carriage can carry 236 passengers, each trip can carry 944 passengers. (Photo: Hoai Nam/Vietnam+)

According to the technical design of the elevated Nhon - Hanoi Railway Station urban railway line, each train consists of 4 carriages, each carriage can carry 236 passengers, each trip can carry 944 passengers. (Photo: Hoai Nam/Vietnam+)

The Hanoi People's Committee has a plan to operate 4 and 6 trains. Accordingly, the train runs during peak hours will be spaced 6 minutes/trip (on average, during peak hours, there are 10 trips/hour/direction to the station to pick up and drop off passengers). Thus, the maximum transport capacity of the route will reach 9,440 passengers/hour/direction. (Photo: Hoai Nam/Vietnam+)

The Hanoi People's Committee has a plan to operate 4 and 6 trains. Accordingly, the train runs during peak hours will be spaced 6 minutes/trip (on average, during peak hours, there are 10 trips/hour/direction to the station to pick up and drop off passengers). Thus, the maximum transport capacity of the route will reach 9,440 passengers/hour/direction. (Photo: Hoai Nam/Vietnam+)

The plan to enhance connectivity and passenger transfer by bus has also been completed by the Hanoi Traffic Management and Operation Center. (Photo: Hoai Nam/Vietnam+)

The plan to enhance connectivity and passenger transfer by bus has also been completed by the Hanoi Traffic Management and Operation Center. (Photo: Hoai Nam/Vietnam+)

Accordingly, there are 36 bus routes operating along the metro line. Two transit points (Cau Giay and Nhon) have 32 bus stops (16 with bus stops). (Photo: Hoai Nam/Vietnam+)

Accordingly, there are 36 bus routes operating along the metro line. Two transit points (Cau Giay and Nhon) have 32 bus stops (16 with bus stops). (Photo: Hoai Nam/Vietnam+)

Currently, 8 stations connect to the nearest bus stop with a distance of 0 - 50m. (Photo: Hoai Nam/Vietnam+)

Currently, 8 stations connect to the nearest bus stop with a distance of 0 - 50m. (Photo: Hoai Nam/Vietnam+)

The urban railway line No. 3 project, the Nhon - Hanoi station section is 12.5km long, with 8 elevated stations and 4 underground stations. Of which, the Nhon - Cau Giay elevated section is 8.5km long and the Cau Giay - Hanoi station underground section is 4km long. (Photo: Hoai Nam/Vietnam+)

The urban railway line No. 3 project, the Nhon - Hanoi station section is 12.5km long, with 8 elevated stations and 4 underground stations. Of which, the Nhon - Cau Giay elevated section is 8.5km long and the Cau Giay - Hanoi station underground section is 4km long. (Photo: Hoai Nam/Vietnam+)

Vietnamplus.vn

Source: https://www.vietnamplus.vn/toan-canh-tuyen-duong-sat-tren-cao-nhon-ga-ha-noi-truoc-ngay-van-hanh-post969037.vnp

Comment (0)

Simple Empty
No data

Same tag

Same category

The 'U-turn' of the only female student admitted directly to Ho Chi Minh City University of Medicine and Pharmacy
How does artificial intelligence work?
Ho Chi Minh City - the shape of a modern 'super city'
A series of events promises to bring Binh Dinh's image far and wide.

Same author

Heritage

Figure

Enterprise

No videos available