Vietnam.vn - Nền tảng quảng bá Việt Nam

Long An calls for investment in residential area project with capital of more than 11,222 billion VND

Báo Đầu tưBáo Đầu tư19/11/2024


Long An calls for investment in residential area project, capital of more than 11,222 billion VND

The project implementation location is in My Hanh Bac commune, Duc Hoa district, Long An province, with a land use area of ​​approximately 214.9217 hectares.

The Department of Planning and Investment of Long An province is inviting interested investors to submit applications to implement the Residential Area project in My Hanh Bac commune, Duc Hoa district, Long An province.

The project has a land area of ​​approximately 214.9217 hectares. The construction land area for the area invested by the investor is expected to be 331,768.24 m2; for the area transferred by the investor to the people for construction is 465,484.41 m2. The population is approximately 30,681 people.

The project is implemented in Duc Hoa district, Long An province.

The project provides real estate products such as transfer and sale of houses (raw construction, completed facade); sale and lease of social housing; sale, lease, and business of service floors within the project land area in accordance with approved planning.

Preliminary housing product structure, for townhouses: The investor will build the rough construction, complete the facade of 1,485 units in the adjacent residential lots belonging to the frontage subdivisions of routes N22, N27, N30, D6, D7 and provincial route 823B with an expected total land area of ​​159,369 m2; construction height of 4 floors; total construction floor area of ​​about 599,085 m2. For the remaining 5,230 adjacent residential lots, the investor will transfer the land use rights to the people for construction, ensuring compliance with the detailed planning at a scale of 1/500 and the design has been appraised and approved.

For villas: The investor will build the rough construction and complete the facade of 46 villas in the villa lots in the subdivisions facing D7 road with a total planned land area of ​​8,101 m2; construction height of 4 floors; total construction floor area of ​​about 18,956 m2. For the remaining 252 villa lots, the investor will transfer the land use rights to the people for construction, ensuring compliance with the detailed planning at a scale of 1/500 and the design has been appraised and approved.

For social housing: The investor invests in building social housing on 5 land lots marked CC-09, CC-10, CC-11, CC-12, CC-13 with an expected total land area of ​​164,298 m2, 9 floors high; total construction floor area of ​​about 201,894.00 m2.

Preliminary total project implementation cost is nearly 7,030 billion VND; compensation, support and resettlement costs are more than 4,192 billion VND.

Project implementation progress is expected to be 6 years (expected from the first quarter of 2025 to the fourth quarter of 2030) from the date of investor approval.



Source: https://baodautu.vn/long-an-keu-goi-dau-tu-du-an-khu-dan-cu-von-hon-11222-ty-dong-d221467.html

Tag: Long An

Comment (0)

Simple Empty
No data

Same tag

Same category

The 'U-turn' of the only female student admitted directly to Ho Chi Minh City University of Medicine and Pharmacy
How does artificial intelligence work?
Ho Chi Minh City - the shape of a modern 'super city'
A series of events promises to bring Binh Dinh's image far and wide.

Same author

Heritage

Figure

Enterprise

No videos available