Vietnam.vn - Nền tảng quảng bá Việt Nam

People are excited about the proposal to build a bridge connecting two urban areas.

The Management Board of Investment and Construction Projects for Transport and Agriculture in Da Nang said it has just submitted a report proposing two options for building a bridge across the Do Toa River (also known as the Do Toan River) connecting 29/3 Street (Cam Le District) to Bui Ta Han Street (Ngu Hanh Son District).

Báo Đà NẵngBáo Đà Nẵng03/04/2025

Scope of research on building a bridge across Do Toa River.
Scope of research on building a bridge across Do Toa River.

With this information, Mr. Trinh Ngoc Phuc, a resident on Bui Ta Han Street, Khue My Ward, Ngu Hanh Son District, excitedly expressed: "I believe that if the project is implemented soon, the two areas of Ngu Hanh Son and Cam Le will develop strongly in the near future". Like Mr. Phuc, Ms. Le Thi Phuong Trang shared: "I have heard about the bridge construction for a long time, but only now have I heard it for sure. For many years, people around this area have been waiting for a bridge connecting the two urban areas of Hoa Xuan and Cam Le".

Meanwhile, Mr. Nguyen Van Hoi, a retired military officer, said that when this bridge is built, traffic will be much more convenient. People who want to move from Bui Ta Han area to Hoa Xuan urban area (Cam Le) will not have to go around Tien Son bridge, or up Minh Mang bridge as before. "We expect that the bridge will not only connect the east and west banks but will open up a new development step with the connecting route from Hoa Xuan urban area - Bui Ta Han street, connecting directly to Truong Sa - Vo Nguyen Giap street as many Ngu Hanh Son voters always suggest...", Mr. Hoi said.

According to the Management Board of Investment and Construction Projects for Traffic and Agricultural Works in Da Nang, the bridge construction plan was prepared by Traffic Construction Consulting Joint Stock Company 5 (TECCO5). Accordingly, the scope of the bridge construction study is at the confluence of Cam Le River and Do Toa River (in Ngu Hanh Son District and Cam Le District). Do Toa River is a section of the river connecting Vinh Dien River (Dien Ban, Quang Nam) flowing to Han River (Da Nang).

According to the proposal of the consulting unit, a simple span bridge with assembled U-beams will be built here and the bridge architecture will be created by the railing system, sidewalks combined with lighting. The main bridge has a total length of 416.3m, arranged according to the diagram (5x12+40+3x42+40+2x40+2x35)m. In which, the span (5x12)m uses a reinforced concrete floor structure on a bored pile system (to reduce the height of the beam bottom to ensure the frequency of P1%), the span (40+3x42+40) uses assembled U38m beams, the span 2x40m is a prestressed reinforced concrete slab structure cast in place suitable for the expansion bridge connecting with two branch bridges, the span 2x35m over Chuong Duong street uses a reinforced concrete frame structure to reduce the architectural height. The aesthetics of the project are designed through the specifications of the railing system, sidewalks and lighting.

The total length of each branch bridge is 96m, arranged according to the diagram (8x12)m with a reinforced concrete floor span structure cast in place to reduce the height of the beam architecture. The semi-basement structure on Chuong Duong Street has a total length of 260m, made of reinforced concrete. The area of ​​land clearance and land acquisition on Bui Ta Han Street is more than 770m2, including more than 450m2 of service land and more than 315m2 of residential land, affecting 10 houses. The total investment proposed by the consulting unit is 732 billion VND, including: construction cost 361 billion VND; site clearance cost 225 billion VND; project management cost, consulting and other costs 50 billion VND; contingency cost 96 billion VND (15%).

It is known that 29/3 Street is more than 3.5km long and belongs to Hoa Xuan Ward (Cam Le District); Bui Ta Han Street is more than 1km long and 15m wide and belongs to Khue My Ward (Ngu Hanh Son District). The construction of a bridge across Do Toa River connecting these two roads is also the connection between the Nam Hoa Xuan ecological urban area (Cam Le District) and the Nam Viet A urban area (Ngu Hanh Son District) to Le Van Hien Street down to the sea.

THANH LAN

Source: https://baodanang.vn/kinhte/202504/nguoi-dan-phan-khoi-khi-co-de-xuat-xay-cau-noi-hai-khu-do-thi-4003108/


Comment (0)

Simple Empty
No data

Same tag

Same category

Fireworks filled the sky to celebrate 50 years of national reunification
50 years of national reunification: The checkered scarf - the immortal symbol of the Southern people
The moment the helicopter squadrons took off
Ho Chi Minh City is bustling with preparations for the "national reunification day"

Same author

Heritage

Figure

Business

No videos available

News

Political System

Local

Product