Vietnam.vn - Nền tảng quảng bá Việt Nam

Salvaging and detonating a bomb near the riverbank in Ha Tinh

Báo Tiền PhongBáo Tiền Phong10/10/2024


TPO - An American-made bomb weighing about 250-300kg was discovered on the edge of the Ngan Mo River in Ha Tinh and was safely salvaged and detonated by authorities.

Close-up of the bomb detonation discovered during the construction of a landslide embankment. Video: Pham Truong

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 1

On October 9, the Cam Xuyen District Military Command (Ha Tinh) coordinated with the Engineering Department (Ha Tinh Provincial Military Command) to deploy a plan to salvage a bomb discovered on the edge of the Ngan Mo River (Cam Due Commune, Cam Xuyen District).

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 2

Two days ago (October 7), a group of workers working on a project to repair landslides on the left bank of the Ngan Mo River discovered a bomb 2-3 meters underground, next to the riverbank, so they reported it to local authorities.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 3

After inspection, authorities recovered the bomb.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 4

Initial inspection determined that this bomb was a remnant of the war, a 500-LB GP MK3 MOD1 bomb manufactured in the US.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 5

The bomb is still quite intact, weighing about 250-300kg, about 1.5m long, and nearly 50cm wide.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 6

Authorities checked the bomb before taking it to the disposal site.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 7

The bomb was moved to the training ground of Thach Ngoc commune (Thach Ha district) for safe detonation.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 8

Engineers prepare to detonate the bomb.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 9

The project to repair the landslide embankment on the left bank of Ngan Mo River (Cam Due Commune, Cam Xuyen District, Ha Tinh) has a total investment of more than 14 billion VND, aiming to ensure the safety of people and civil infrastructure before the rainy and stormy season. The project is about 400m long, the embankment is 4.5 - 5m high, built of concrete and steel. The project started construction last August and is expected to be completed by the end of the year.

Half-ton bomb discovered during riverbank embankment construction
Half-ton bomb discovered during riverbank embankment construction

Arrested suspect who threw 'petrol bombs' at 3 banks in Phu Yen
Arrested suspect who threw 'petrol bombs' at 3 banks in Phu Yen

Day and night building embankments to overcome riverbank erosion in Ha Tinh
Day and night building embankments to overcome riverbank erosion in Ha Tinh

Pham Truong



Source: https://tienphong.vn/truc-vot-huy-no-qua-bom-canh-mep-song-o-ha-tinh-post1680835.tpo

Comment (0)

Simple Empty
No data

Same tag

Same category

Fireworks filled the sky to celebrate 50 years of national reunification
50 years of national reunification: The checkered scarf - the immortal symbol of the Southern people
The moment the helicopter squadrons took off
Ho Chi Minh City is bustling with preparations for the "national reunification day"

Same author

Heritage

Figure

Business

No videos available

News

Political System

Local

Product