Vietnam.vn - Nền tảng quảng bá Việt Nam

Độc lập - Tự do - Hạnh phúc

Handling damage, ensuring traffic on National Highway 14D

Việt NamViệt Nam25/01/2025


z6254166675500_5c9daa77b6a7382521036ef2c0978051.jpg
National Highway 14D is severely degraded. Photo: CT

On January 16, 2025, the Department of Transport of Quang Nam reported the damage to traffic infrastructure on National Highway 14D due to the impact of heavy rains occurring from October 27, 2024 to January 14, 2025.

Along with that, the high density of heavy trucks has caused local damage to the surface of National Highway 14D, making it difficult for people and vehicles to travel, causing environmental pollution and potential traffic safety risks. The damage is mainly in the form of potholes due to the peeling of the existing foundation and road surface with a depth of 0.2 - 0.4m.

Due to the important location of National Highway 14D (connecting Ho Chi Minh Road with Nam Giang International Border Gate), to ensure traffic safety and gradually complete the traffic infrastructure system, develop the socio-economy associated with ensuring national defense and security, the Ministry of Transport has issued Document No. 13033, dated November 29, 2024, to the Government Office, proposing that the Government Office report to the Prime Minister to consider and invest in the project to upgrade National Highway 14D, the section passing through Quang Nam province.

z6254167650901_ffa9d08ef4390919f7e3d16d28d2203e.jpg
Repairing with crushed stone is only a temporary solution. Photo: CT

While waiting for the Prime Minister 's direction on investing in the project to upgrade National Highway 14D, in order to have a basis for implementing activities to overcome the consequences of natural disasters and restore traffic activities according to regulations, the Quang Nam Department of Transport proposed that the Vietnam Road Administration approve the scale and solution to ensure temporary traffic by leveling crushed stone to flatten potholes and subsidence areas with a treatment volume of about 21,052m2 .

The Vietnam Road Administration has agreed on solutions to ensure traffic at locations with locally damaged foundations and road surfaces as requested and requested the Quang Nam Department of Transport to urgently implement them.

Quang Nam Department of Transport is responsible for reviewing the damage volume to ensure that the treatment locations do not overlap with the volume performed in regular maintenance work, the volume of periodic repair projects being implemented, or have been implemented and are in the construction warranty period.



Source: https://baoquangnam.vn/xu-ly-hu-hong-dam-bao-giao-thong-tren-quoc-lo-14d-3148182.html

Comment (0)

Simple Empty
No data
Patriotism in the young way
People joyfully welcome the 80th anniversary of National Day
Vietnam women's team beat Thailand to win bronze medal: Hai Yen, Huynh Nhu, Bich Thuy shine
People flock to Hanoi, immersing themselves in the heroic atmosphere before National Day.
Suggested locations to watch the parade on National Day September 2
Visit Nha Xa silk village
See beautiful photos taken by flycam by photographer Hoang Le Giang
When young people tell patriotic stories through fashion
More than 8,800 volunteers in the capital are ready to contribute to the A80 festival.
The moment the SU-30MK2 "cuts the wind", air gathers on the back of the wings like white clouds

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product