This is a project to celebrate the 80th anniversary of the August Revolution (August 19, 1945 - August 19, 2025) and the National Day of the Socialist Republic of Vietnam (September 2, 1945 - September 2, 2025).
The Central Maternity Hospital's second facility was invested with a total cost of about 950 billion VND, built on a land area of nearly 60,000 m², of which the construction area is more than 8,400 m². The project consists of 6 floors above ground, 1 technical floor and 1 attic floor, designed in a modern style.
According to the plan, the hospital has a scale of 300 inpatient beds, receiving about 1,000 visits per day. The professional organization at the second facility includes 11 clinical departments, 4 paraclinical departments, and many supporting functional departments such as coordination room, customer care, pharmacy, pharmaceutical warehouse, technical logistics. The hospital is arranged to serve both long-term inpatient treatment needs and high-quality outpatient examination.
The project has modern, environmentally friendly architecture. Medical equipment has been invested synchronously from diagnosis, treatment to recovery, medical staff has been transferred and arranged reasonably.
At the National Children's Hospital, Branch 2, the system of modern medical equipment and machinery in the departments and rooms is ready for operation. Many leading advanced equipment in the field of Pediatrics such as: Testing system, diagnostic imaging, emergency resuscitation, operating room system... are being tested, ensuring that they fully meet the technical and professional safety requirements as prescribed by the Ministry of Health.
The second facility of the National Children's Hospital was invested with more than 880 billion VND, with a total land area of about 6 hectares, of which the construction area is about 7,530 m2, including 1 administrative block, 1 paraclinical block, 2 inpatient treatment blocks 5 floors high, 1 basement, and accompanying synchronous technical infrastructure items.
Facility 2 is organized with 11 clinical departments, 4 paraclinical departments and 1 functional unit, ensuring full implementation of emergency, medical examination and treatment and rehabilitation tasks for children. 300 inpatient beds are scientifically arranged... All essential medicines and medical supplies have been stocked, arranged and preserved in accordance with regulations.
Regarding human resources, the team of doctors and leading experts from facility 1 will rotate to work at facility 2, to ensure that all children have access to equivalent professional quality, while creating consistency in the treatment process.
PV (synthesis)Source: https://baohaiphong.vn/sap-khanh-thanh-2-benh-vien-quy-mo-hon-1-800-ty-dong-o-ha-noi-518464.html
Comment (0)