On July 31, Rach Mieu 2 Bridge project will be completed.

On July 27, Mr. Tran Van Thi, Director of My Thuan Project Management Board, said that up to now, the overall progress of the Rach Mieu 2 Bridge Construction Investment Project (connecting Dong Thap and Vinh Long provinces) is 99% complete.

Báo Sài Gòn Giải phóngBáo Sài Gòn Giải phóng27/07/2025

z6846056086078_2d832266472bade7e404f6ff9d2d36df.jpg
The road section of Rach Mieu 2 bridge project has completed asphalt concrete paving construction for about 13.7/14km.

According to Mr. Thi, the road has completed asphalt concrete construction for about 13.7/14km. The bridge section on the route has completed 5/5 bridges (Xoai Hot bridge, My Tho bridge, Tam Son bridge, Ba Lai bridge, Song Ma bridge).

z6846056037885_125a56b7c36a67738e649a042f191a31.jpg
The main bridge - Rach Mieu 2 bridge has completed the asphalt concrete pavement and basically completed the main construction items of the bridge.

The approach and main bridge of Rach Mieu 2 Bridge have completed the asphalt concrete pavement and basically completed the main construction items of the bridge. Currently, the construction units are continuing to carry out the experimental work of measuring the vibration of the cables/shock absorbers, implementing the work of inspecting the bridge load test, etc.

On July 31, Rach Mieu 2 Bridge will be completed.

z6846056070543_d16a2eac173bbb7882524d6896e49ad1.jpg
z6846056018583_b32e47c29ec986511e3c3a420e0aab24.jpg
Construction units day and night

It is expected that in early August, the units will meet to approve the project acceptance inspection council, then hand it over to Dong Thap and Vinh Long provinces.

z6846056072463_f76a1e6ed0f315b755591dd997daadc8.jpg
z6846056009760_b7cb0106e158a08d40cba571a1e3bbc3.jpg

The Rach Mieu 2 Bridge construction investment project is expected to be inaugurated and put into operation before September 2.

z6846056077782_280a3bd495e7589f6ef87b745774a37c.jpg

At the construction site, the units are continuing to maintain more than 35 construction teams; about more than 100 pieces of equipment; 350 workers and 70 technical staff... implementing construction in 3 shifts, 4 teams. All are determined to complete the project as directed by the Prime Minister .

z6846056056829_b8c6ab72528a160f8c829cdcb64730c1.jpg

The Rach Mieu 2 Bridge Project starts at Dong Tam intersection (the intersection between National Highway 1 and Provincial Road 870) in Dong Thap province; the project ends at about Km16+660 National Highway 60, about 0.71km from the northern abutment of Ham Luong Bridge, in Vinh Long province. The project has a total investment of more than 6,810 billion VND, with My Thuan Project Management Board as the investor.

z6846056032440_e6347a00472586f7e718a800faf8517f.jpg

Rach Mieu 2 main bridge is a cable-stayed bridge, with a length of 1,971.2m, a 4-lane level III delta road, the total length of the project is about 17.6km. When completed, the project will help reduce pressure on the existing Rach Mieu bridge, minimizing traffic congestion on weekends and holidays.

z6846056044085_29fea3d0d6adbf3b80b0041f9bf78d94.jpg
z6846056006926_43744ef0ebee630f645991ddd3d59993.jpg
On July 31, the entire Rach Mieu 2 bridge project will be completed.

Source: https://www.sggp.org.vn/ngay-31-7-cong-trinh-cau-rach-mieu-2-se-hoan-thanh-post805710.html


Comment (0)

Simple Empty
No data
Patriotism in the young way
People joyfully welcome the 80th anniversary of National Day
Vietnam women's team beat Thailand to win bronze medal: Hai Yen, Huynh Nhu, Bich Thuy shine
People flock to Hanoi, immersing themselves in the heroic atmosphere before National Day.
Suggested locations to watch the parade on National Day September 2
Visit Nha Xa silk village
See beautiful photos taken by flycam by photographer Hoang Le Giang
When young people tell patriotic stories through fashion
More than 8,800 volunteers in the capital are ready to contribute to the A80 festival.
The moment the SU-30MK2 "cuts the wind", air gathers on the back of the wings like white clouds

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product