Vietnam.vn - Nền tảng quảng bá Việt Nam

Detailed information about rest stops on the North-South Expressway

In order to facilitate people's travel during the holidays, the Vietnam Road Administration has provided information about rest stops on the Eastern North-South Expressway.

Báo Công an Nhân dânBáo Công an Nhân dân01/05/2025

In the Northern area from Hanoi to Vinh (Ha Tinh), there is a rest stop operated by Vietnam Expressway Corporation (VEC) at Km227; Xuan Cuong station on the right side of the route at Km269), Xuan Khiem station on the left side of the route at Km269+410).

In addition, in this area, there is a temporary rest stop on the Mai Son-National Highway 45 highway at Km329+700, which coincides with the approved rest stop location; a station on the Nghi Son-Dien Chau highway at Km427+035, which coincides with the approved rest stop location. The distance between the two stations in this area is 98km between the Mai Son-National Highway 45 and Nghi Son-Dien Chau highways.

Detailed information about rest stops on the North-South Expressway during the holidays that people need to know -0
Rest stops on the highway will help people rest and ensure more safety while traveling.

In the southern area from Nha Trang (Khanh Hoa province) to Ho Chi Minh City, there is a rest stop on the Ho Chi Minh City-Long Thanh-Dau Giay route in operation. In addition, there are temporary rest stops on the following routes: Nha Trang-Cam Lam at Km33+930 on both sides of the road; Cam Lam-Vinh Hao at Km113 on both sides of the road; Vinh Hao-Phan Thiet at Km205+092 on both sides of the road; Phan Thiet-Dau Giay at Km47+500 on both sides of the road. The distance between two stations in this area is 92km between the Cam Lam-Vinh Hao and Vinh Hao-Phan Thiet expressways. Currently, all the branches leading to and from the intersections of the expressways with the National Highway have gas stations.

Particularly for the Cam Lo-La Son route connecting Quang Tri with Hue, which is about 98.3 km long, a temporary rest stop has been arranged at Km64+200 on the left side of the route and Km77+800 on the right side of the route.

Regarding the investment in the construction of 21 rest stops on the Eastern North-South Expressway, the Vietnam Road Administration has signed contracts for 18 rest stops; 1 station on the Quy Nhon-Chi Thanh Expressway is selecting an investor, expected to open bidding on May 26, 2025; 2 stations on the Can Tho-Hau Giang and Hau Giang-Ca Mau expressways are adjusting project information.

Source: https://cand.com.vn/Giao-thong/thong-tin-chi-tiet-ve-cac-tram-dung-nghi-tren-cao-toc-bac-nam--i767018/


Comment (0)

Simple Empty
No data

Same category

Heaven and earth in harmony, happy with the mountains and rivers
Fireworks filled the sky to celebrate 50 years of national reunification
50 years of national reunification: The checkered scarf - the immortal symbol of the Southern people
The moment the helicopter squadrons took off

Same author

Heritage

Figure

Business

No videos available

News

Political System

Local

Product