Vietnam.vn - Nền tảng quảng bá Việt Nam

Độc lập - Tự do - Hạnh phúc

Approval of route from new National Highway 3 service road in Dong Anh district

Báo Kinh tế và Đô thịBáo Kinh tế và Đô thị12/10/2024


Illustration photo.
Illustration photo.

According to the Decision, the plan and location of the route from the new National Highway 3 service road through the People's Committee of Van Ha commune to the end of Dong Anh district, scale 1/500, prepared by the Hanoi Institute of Construction Planning, and appraised by the Hanoi Department of Planning and Architecture. The starting point of the route intersects with the new National Highway 3 service road, the end point is at the border between Dong Anh district, Hanoi city and Tu Son city, Bac Ninh province, with a length of about 1.84 km. The route direction is determined based on the General Construction Plan of Van Ha commune approved by the People's Committee of Dong Anh district.

The typical cross-section width B = 40m includes the following components: Roadway 2x11.25m (6 lanes), median strip 3m, sidewalks on both sides 2x7.25m. At the beginning of the route intersecting with the new National Highway 3, the cross-section of the road consists of 3 main components: Overpass over the new National Highway 3 with width B = 19.5m (4 lanes), Northern branch B = 21.5m (3 lanes), Southern branch B = 13m (2 lanes).

Intersections are determined based on the road network according to the approved planning; details will be further studied and accurately determined during the detailed planning process for both sides of the road or the investment project for the cross-road route approved by the competent authority.

The red line of the road is determined based on the planned road centerline, road cross-section, technical parameters, dimensions and combined with interpolation specifically determined on the drawing.

The City People's Committee assigned the Department of Planning and Architecture to check and confirm the plan drawings and route locations according to the approval decision of the City People's Committee.

Dong Anh District People's Committee organizes the public announcement of the approved route plan and location documents for relevant organizations and individuals to know and implement; strictly manages land and construction order on both sides of the route according to the approved planning, plan and location of the route; deploys the work of setting up road boundary markers at the same time as carrying out land recovery and site clearance during the implementation of the investment project.



Source: https://kinhtedothi.vn/phe-duyet-tuyen-duong-tu-duong-gom-quoc-lo-3-moi-tai-huyen-dong-anh.html

Comment (0)

Simple Empty
No data
Overview of the first A80 training session at Ba Dinh Square
Lang Son expands international cooperation in preserving cultural heritage
Patriotism in the young way
People joyfully welcome the 80th anniversary of National Day
Vietnam women's team beat Thailand to win bronze medal: Hai Yen, Huynh Nhu, Bich Thuy shine
People flock to Hanoi, immersing themselves in the heroic atmosphere before National Day.
Suggested locations to watch the parade on National Day September 2
Visit Nha Xa silk village
See beautiful photos taken by flycam by photographer Hoang Le Giang
When young people tell patriotic stories through fashion

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product