Vietnam.vn - Nền tảng quảng bá Việt Nam

Độc lập - Tự do - Hạnh phúc

Install 30 additional speed limit signs on National Highway 1 through Dong Nai

Báo Giao thôngBáo Giao thông24/03/2024


On March 24, according to Road Management Office IV.2 (Road Management Area IV, Vietnam Road Administration), the management unit of National Highway 1 has just installed 30 additional maximum speed signs on National Highway 1, Xuan Loc district and Long Khanh city ( Dong Nai ).

Lắp bổ sung 30 biển báo giới hạn tốc độ tối đa trên QL1 qua Đồng Nai- Ảnh 1.

Authorities installed additional speed limit signs on National Highway 1. Photo: Hoang Long

Of which, 12 signs were added (in both directions) from Km 1799+400 - Km 1802+410, through Suoi Cat commune, Xuan Loc district.

Add 18 signs from route Km 1823+200 - Km 1827+100, section through Suoi Tre ward, Long Khanh city.

According to this unit, these are reminder signs placed behind intersections and adjacent roads on National Highway 1.

The installation of signs is to help drivers moving from branch roads to National Highway 1 know the permitted speed limits on the above sections so that they can adjust their speed appropriately; ensuring traffic safety through the area.

It is known that the maximum speed allowed at the above locations is 60km/h. However, in order for drivers coming from the alleys to know the maximum speed allowed to drive at the correct speed and ensure safety, the unit has installed additional signs at the intersections...



Source

Comment (0)

Simple Empty
No data

Same tag

Same category

Summary of A80 training: The army marches in the arms of the people
Gen Z's creative and unique way of showing patriotism
Inside the exhibition venue for the 80th anniversary of National Day, September 2nd
Overview of the first A80 training session at Ba Dinh Square

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product