Vietnam.vn - Nền tảng quảng bá Việt Nam

Độc lập - Tự do - Hạnh phúc

Nearly 23 billion VND to repair 7.4km of National Highway 14C through Lam Dong

There are 9 sections of National Highway 14C, over 7.4km long, through Lam Dong, that will have their foundation, road surface, drainage system and traffic safety repaired.

Báo Lâm ĐồngBáo Lâm Đồng04/08/2025

b IMG_8092
Traffic is difficult on some damaged and degraded sections of National Highway 14C through Lam Dong.

On August 4, the leader of Lam Dong Department of Construction said that the unit has just approved the results of the contractor selection for the construction package of National Highway 14C. This package repairs the roadbed, road surface, drainage system and ensures traffic safety for 9 sections of National Highway 14C with a length of 7.44km.

The winning bidder is Hoang Vu - Dai Luc Joint Venture (including Hoang Vu Construction Company Limited and Dai Luc Company Limited). The total value of the bid package is nearly 22.9 billion VND. The bid package implementation period is within 180 days.

Most of the sections of National Highway 14C that will be repaired this year pass through the two border communes of Thuan An and Dak Wil. These are degraded sections of road, affecting people’s travel, movement between border posts, and forest management and protection.

According to Lam Dong Department of Construction, National Highway 14C runs through the province for about 162.5km. This is the road running along the border area and is one of the province's main national highways.

Of which, the National Highway 14C section passing through the border communes of Thuan An and Dak Wil is nearly 50km long. This road section was invested in and built about 15 years ago, so it has degraded and needs to be repaired and renovated.

Every year, the Central Government allocates funds to renovate and upgrade National Highway 14C. With limited funds, the locality has proactively reviewed and gradually repaired severely damaged sections of the route, contributing to improving travel conditions for the people.

Source: https://baolamdong.vn/gan-23-ty-dong-sua-chua-7-4km-quoc-lo-14c-qua-lam-dong-386349.html


Comment (0)

Simple Empty
No data
Inside the exhibition venue for the 80th anniversary of National Day, September 2nd
Overview of the first A80 training session at Ba Dinh Square
Lang Son expands international cooperation in preserving cultural heritage
Patriotism in the young way
People joyfully welcome the 80th anniversary of National Day
Vietnam women's team beat Thailand to win bronze medal: Hai Yen, Huynh Nhu, Bich Thuy shine
People flock to Hanoi, immersing themselves in the heroic atmosphere before National Day.
Suggested locations to watch the parade on National Day September 2
Visit Nha Xa silk village
See beautiful photos taken by flycam by photographer Hoang Le Giang

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product