Vietnam.vn - Nền tảng quảng bá Việt Nam

Hanoi reorganizes traffic on a series of streets

Báo Giao thôngBáo Giao thông23/03/2025

To ensure traffic safety and order and reduce traffic congestion, the Hanoi Department of Construction cut the median strip on Khuat Duy Tien Street and reorganized traffic on a series of streets...


The Hanoi Department of Construction has just requested the Traffic Infrastructure Maintenance Board to coordinate with its affiliated units to implement work to ensure traffic safety and reduce traffic congestion in Hanoi.

Hà Nội tổ chức lại giao thông một loạt tuyến phố- Ảnh 1.

Cutting the median strip to widen the road for people to move on Khuat Duy Tien street. Illustration photo.

Notably, the Hanoi Department of Construction requested its affiliated units to implement a plan to cut down the median strip 70m long and 3m wide in front of Taisei Tower 289 Khuat Duy Tien. Move technical infrastructure for trees, lighting, etc. and move the bus stop 150m back towards Trung Hoa intersection.

At the same time, narrow part of the traffic island on Khuat Duy Tien Street at the red light stop at Trung Hoa intersection in the direction of Mai Dich, the width is narrowed to about 3.2m.

At the Do Duc Duc - Pham Hung intersection, the Hanoi Department of Construction requested to count the traffic volume turning left from Pham Hung Street to Do Duc Duc Street and the road connecting Nam Trung Yen resettlement area to Pham Hung Street; study and adjust traffic lights to match the actual traffic volume.

On Nguyen Khoi Street (from Thanh Tri Bridge to Vinh Tuy Bridge), signs prohibiting trucks during rush hours (morning 6:00-9:00, afternoon 16:00-19:30) from inside the border gates to Nguyen Khoi dike road at the following locations: Hanoi Port Border Gate, Dike Guard Station 18, opposite Lane 670; Lane 615; Lane 653; Lane 683).

Giai Phong-Le Duan-Dai Co Viet intersection, arrange a raised left turn lane for vehicles turning left from Giai Phong to Xa Dan. Install curbs to prevent motorcyclists from entering the lane for the disabled at the traffic island on the side of Xa Dan street.

At the May 10 - Nguyen Van Linh intersection, the Hanoi Department of Construction requested to adjust the cycle of the pedestrian crossing light system to match the area's traffic volume to reduce congestion on the route.

For the Phap Van expressway service road area at the end of lane 15 Tran Thu Do, install mesh fences at damaged, lost and missing locations. Repair damaged guardrails and carry out environmental sanitation in the area.



Source: https://www.baogiaothong.vn/ha-noi-to-chuc-lai-giao-thong-mot-loat-tuyen-pho-192250323153925592.htm

Comment (0)

Simple Empty
No data

Same tag

Same category

Pilot recounts the moment 'flying over the sea of ​​red flags on April 30, his heart trembled for the Fatherland'
Ho Chi Minh City 50 years after reunification
Heaven and earth in harmony, happy with the mountains and rivers
Fireworks filled the sky to celebrate 50 years of national reunification

Same author

Heritage

Figure

Business

No videos available

News

Political System

Local

Product