Vietnam.vn - Nền tảng quảng bá Việt Nam

Why does Tra Khuc 2 bridge through Quang Ngai have to be "closed" for 2 months?

Báo Giao thôngBáo Giao thông17/07/2024


In addition to traffic direction guidance, at the construction site at both ends of Tra Khuc 2 Bridge, the contractor will install traffic lights, encourage sand pouring on both sides of the bridge, and create obstacles to increase vigilance for vehicles traveling at night, and prevent reckless overtaking when moving to the bridge. At the same time, at important intersections, relevant agencies will arrange for people to be on duty regularly, guiding and directing traffic for heavy vehicles, and will not be allowed to enter routes outside the traffic planning.



Source: https://www.baogiaothong.vn/vi-sao-cau-tra-khuc-2-qua-quang-ngai-phai-dong-cua-trong-2-thang-192240716171644766.htm

Comment (0)

Simple Empty
No data

Same tag

Same category

The moment the helicopter squadrons took off
Ho Chi Minh City is bustling with preparations for the "national reunification day"
Ho Chi Minh City after national reunification
10,500 drones show in Ho Chi Minh City sky

Same author

Heritage

Figure

Business

No videos available

News

Political System

Local

Product