Vietnam.vn - Nền tảng quảng bá Việt Nam

Độc lập - Tự do - Hạnh phúc

Hai Duong competes for architectural design of Van bridge connecting National Highway 37 with Trieu bridge approach road

Việt NamViệt Nam06/03/2024

1-20231027152126349-d8e788377a55fba5b15a1c4938355672.jpg
Van Bridge connects National Highway 37, Chi Linh City with Trieu Bridge approach road, Kinh Mon town (Photo: Vietnammoi.vn)

Accordingly, the content of the architectural design competition for Van bridge is adjusted and supplemented. The investor organizes the architectural competition according to the provisions of law.

According to the report of the Provincial People's Committee, Van Bridge over Kinh Thay River belongs to the Project to invest in the construction of the road and Van Bridge connecting National Highway 37, Chi Linh City with the approach road to Trieu Bridge, Kinh Mon Town. It is a project of level I scale, with a part of the bridge located in the urban area of ​​Chi Linh City (in Tan Dan Ward) and a part of the bridge located in Quang Thanh Commune, Kinh Mon Town, which is subject to the competition for architectural plans according to the provisions of Article 17 of the Law on Architecture 2019. However, the content of the competition for architectural plans of Van Bridge is not proposed in the approved investment policy of the project. In order to have a basis for organizing the competition for architectural plans of Van Bridge according to regulations, it is necessary to adjust the investment policy of the project, including the content of organizing the competition for architectural plans of Van Bridge.

0-2023102715212490-9904207360ed74e3310c95315f2e5955.jpg
Location map of the planned construction of Van bridge across Kinh Thay river (Photo: Vietnammoi.vn)

Other contents of the project remain unchanged. Previously, on June 24, 2022, the People's Council of Hai Duong province issued Resolution No. 18/NQ-HDND on deciding on the investment policy of the project: Investing in the construction of the road and Van bridge connecting National Highway 37, Chi Linh city with the approach road to Trieu bridge, Kinh Mon town. The total length of the route is 12.97km, including the main route of 9.72km and the branch route of 3.25km.

The content and scale of investment in the road construction are according to the scale of a level III plain road, with a design speed of 80km/h, a 12m wide roadbed and an 11m wide road surface. Construct a new Van bridge with a prestressed reinforced concrete structure, a bridge width of 12m, and a total bridge length of about 919m.

The project is invested by the Hai Duong Provincial Construction Investment Project Management Board. The total estimated investment of the project is over VND 1,296 billion; the implementation period is 2021-2025 and 2026-2030.

PV

Source

Comment (0)

Simple Empty
No data

Same tag

Same category

Summary of A80 training: Vietnam's strength shines under the night of the thousand-year-old capital
Hanoi traffic chaos after heavy rain, drivers abandon cars on flooded roads
Impressive moments of the flight formation on duty at the A80 Ceremony
More than 30 military aircraft perform for the first time at Ba Dinh Square

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product