Vietnam.vn - Nền tảng quảng bá Việt Nam

Độc lập - Tự do - Hạnh phúc

Dai Ngai Bridge project adds a route connecting National Highway 91B and National Highway 60

The Ministry of Construction has just decided to adjust the investment policy for the Dai Ngai Bridge construction project, including adding a 12.3km long section connecting National Highway 91B with National Highway 60 through Can Tho City.

Báo Sài Gòn Giải phóngBáo Sài Gòn Giải phóng29/07/2025

Dai Ngai Bridge 2
Dai Ngai Bridge 2

The new route starts at the intersection with National Highway 91B (Nam Song Hau Road), in Dai Ngai Commune, and ends at the intersection with National Highway 60, Soc Trang Ward, Can Tho City. The route is designed according to the standards of a grade III plain road, with an operating speed of 80km/h.

Phase 1 of the route will be built with a scale of 2 lanes, but site clearance will be carried out on a complete scale with a roadbed width of 20.5m, creating favorable conditions for future expansion.

After adjustment, the total designed length of the entire Dai Ngai bridge project is 27.44km. Of which, the bridge section is 3.42km long, the road section (including medium and small bridges on the route) is 24.02km long.

The preliminary total investment for phase 1 of the project is over 7,962 billion VND, using state budget capital. The implementation period is from 2023 and is expected to be put into operation from 2028.

Source: https://www.sggp.org.vn/du-an-cau-dai-ngai-duoc-bo-sung-them-tuyen-duong-noi-quoc-lo-91b-va-quoc-lo-60-post805938.html


Comment (0)

Simple Empty
No data

Same tag

Same category

More than 30 military aircraft perform for the first time at Ba Dinh Square
A80 - Rekindling a proud tradition
The secret behind the nearly 20kg trumpets of the female military band
Quick review of how to get to the 80th Anniversary Exhibition of the Journey of Independence - Freedom - Happiness

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product